Date de publication: 14 septembre 2015
Promoteur – Intermédiaire Financier
ISTANBUL BUYUKSEHIR BELEDIYESILieu
Description
Construction of a new 23 km underground metro line in Istanbul, on the European side of the city between Mahmutbey and Kabatas.
Objectifs
The project is expected to generate savings in user time, vehicle operating costs, road accident costs, local air/noise emissions as well as a reduction in greenhouse gas emissions as a result of the expected modal shift of passengers from road to rail.
Commentaires
Secteur(s)
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Montant BEI envisagé (montant approximatif)
EUR 295 million
Coût total (montant approximatif)
EUR 1400 million
Aspects environnementaux
If situated within the EU, the project would fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore be subject to a screening decision of the competent authority. In this case, the project was screened out based on an environmental assessment prepared in 2007. These documents will be reviewed and assessed during the appraisal to ensure compliance with the EIB's environmental and social standards.
Passation des marchés
The Bank will require the promoter to ensure that for works to be financed by the proposed EIB loan, procurement procedures are carried out in accordance with the Bank's Guide to Procurement.
Statut
Signé - 18/12/2015