Date de publication: 17 septembre 2013
Promoteur – Intermédiaire Financier
ELIA SYSTEM OPERATOR SALieu
Description
Upgrade and reinforcement of the high-voltage electricity transmission grid in Belgium. Investment programme 2013-2018.
Objectifs
The project is part of a national Grid Development plan that is subject to a Strategic Environmental Assessment in line with the requirements of the SEA Directive.
Commentaires
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 100 million
Coût total (montant approximatif)
EUR 433 million
Aspects environnementaux
By their technical characteristics some project components fall under Annex I or Annex II of the EIA Directive. The impacts that can be typically expected for these components relate to visual impact, vegetation clearance, birds strikes and mortality, electromagnetic fields, noise nuisance, disturbance during construction and impact on seabed fauna and flora. Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EEC and Dir. 2007/66/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Signé - 16/05/2017