Referenz: 20080263
Veröffentlichungsdatum: 11 Mai 2010

Projektträger – zwischengeschaltetes Finanzinstitut

For the power plant: Itezhi-Tezhi Power Corportion, Attn. Mr Robert Nsamba, Director
Phone +260 (211) 239 343 Fax +260 (211) 239 343 e-mail: rnsamba@itpc.co.zm.
For the transmision lines: ZESCO, Mr. Julius Kampamba Acting Senior Manager Transmission Development
Phone +260 (211) 363 521 e-mail: jkampamba@zesco.co.zm.

Ort

Beschreibung

The project consists of a new 120 MW hydropower plant, benefiting from the use of an existing dam and a reservoir infrastructure, and a 260 km extension of the 220/330 kV transmission system to supply renewable energy to meet the growing demand of the country and the region.

Ziele

The project is expected to provide electricity at a competitive cost to the Zambian and Southern Africa regional electricity networks. The majority of the power plant projects currently under implementation in the region are based on conventional coal-fired technology. This project will therefore contribute to avoiding emissions of CO2 and other harmful air pollutants. The Zambian electricity network has a severe generation deficit, which has resulted in load shedding and related damages to the economy of the country and of the region. The project is in line with the economic development and environmental objectives of the Cotounou Mandate, as well as the EU’s environmental policies with respect to climate change and renewable energy.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 50 million.

Gesamtkosten (voraussichtlicher Betrag)

Indicative amount: EUR 265 million.

Umweltaspekte

Due to its size and technical characteristics the power plant, if located inside the EU, would be classified under Annex II of the EIA Directive and the high voltage overhead transmission lines under Annex I, requiring an Environmental Impact Assessment. The promoters have implemented two EIAs, one for the power plant and another one for transmission investments. Both EIAs cover the cumulative effects of the project. The project will comply with the Bank’s environmental and social guidelines, including appropriate public consultation and mitigation of impacts on biodiversity.

Auftragsvergabe

The promoters will be required to conduct procurement for the project components in line with the Banks Guide to Procurement.

Projektstatus

Unterzeichnet - 10/12/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Sambia Energie