Date de publication: 5 décembre 2007
Promoteur – Intermédiaire Financier
Ministry of Transport and Communication of the Federation of Bosnia and Herzegovina.
Lieu
Description
The project concerns a new motorway section adjacent to those already under preparation or construction, namely Zenica South - Kakanj, in a length of about 15 km.
Objectifs
The project will significantly increase accessibility and reduce travel times, thereby contributing to a balanced economic development of the regions concerned. Current average speeds on existing road are estimated at some 50 km/h and these should rise to 120 km/h with the new infrastructure. Commuting among main cities and towns along the corridor will be much faster and more comfortable.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 75 million.
Coût total (montant approximatif)
About EUR 158 million.
Aspects environnementaux
This type of project (construction of a motorway) falls under Annex I of EU Directive 85/337/EEC as amended by Directive 97/11/EC and thus requires a full EIA.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement and applicable EU rules.
Statut
Signé - 18/12/2008