Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20030552
Date de publication: 30 janvier 2004

Promoteur – Intermédiaire Financier

Zweckverband Kliniken im Mühlenkreis, Minden.

Lieu

Description

With about 1,073 beds, the hospital in Minden serves as the only provider of comprehensive medical services in a region covering the north Eastern part of NRW as well as the southern part of the Federal State of Lower Saxony (about 400,000 inhabitants).

Objectifs

Currently, the hospital is located in two sites in the city centre. The buildings, which were built in the 19th century, have increasingly become outdated. Maintenance and modernisation are expensive, and operating costs are high. The decision to build a completely new hospital on a green-field site has been taken after an analysis came to the conclusion that the rehabilitation of the existing buildings would cost about EUR 70m – without achieving higher operational efficiency.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 70 m.

Coût total (montant approximatif)

Up to EUR 228 m.

Aspects environnementaux

The new project will be constructed on an existing green-field site, outside the existing urban area. To some extent it will relieve what have become chronic traffic and access problems within the inner city area where the old hospitals are located, and provide the hospital population with contemporary service and accommodation set in a parkland. Energy saving concepts, possibly involving the use of District Heating or other renewal sources, are being considered. Planting and lakes are part of the overall design concept.

Passation des marchés

European Directives in respect of Public Procurement are enshrined into Federal German Law. The procurement process is soon to be launched. To be reviewed during Appraisal.

Statut

Signé - 24/11/2004

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Santé