    Fiche récapitulative

    Date de publication
    7 mai 2026
    Statut
    Référence
    À l'examen | 12/03/2026
    20260109
    Nom du projet
    Promoteur – Intermédiaire financier
    S11 EXPRESSWAY NORTH - SOUTH CORRIDOR COMPLETION
    MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND GEN. DIRECTOR
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 625 million
    EUR 1582 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The Project concerns the construction of the remaining missing sections of the strategic North-South S11 corridor, aiming to ensure a continuous expressway connection from Koszalin to Katowice. It comprises two discontinuous sections of the S11 North corridor (Bobolice to Szczecinek and Oborniki to Poznan, including the Oborniki bypass, with a total length of 46.5 km) and one section of the S11 South corridor (Przygodzice to Olesno, including the widening of the existing Kepno bypass, totalling 79.6 km).

    The project is addressing market/network failures related to accessibility. The project contributes to improved efficiency of TEN-T road network in Poland, thereby improving accessibility and market integration. The project is expected to contribute to the reduction of safety-related negative externalities, by diverting heavy and transit traffic from the agglomerations crossed by the national and local roads. The project will contribute to better accessibility in the region by adapting the technical and operational parameters of the road to the forecast traffic level, removing bottlenecks and completing missing elements of an efficient road infrastructure. Overall, the project will contribute towards fulfilling public policy targets aimed at the development of efficient and safe road transport system, which is properly adapted to the negative impacts of climate change. The project is located in less developed and transition regions of Poland, making it eligible under Article 309 (a) projects for developing less-developed regions. The entire project section is part of the TEN-T Comprehensive network (Regulation 2024/1679), and the project is therefore eligible also under Article 309 (c) common interest of the Treaty on the Functioning of the EU. It also contributes to the EIB Public Policy Goal (PPG) of Sustainable Cities and Regions.

    Aspects environnementaux
    Passation des marchés

    The project includes multiple sections of the S11 expressway, which fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), and are therefore subject to a full EIA procedure. A total of six Environmental Decisions have been issued by the Regional Directorates for Environmental Protection (RDO?), covering all eight sections of the project. In cases where the decision was appealed, it was confirmed by the General Directorate for Environmental Protection (GDO?) and, where relevant, by the Administrative Court (WSA). One construction permit (ZRID) was granted in 2022 for the Bobolice - Szczecinek section. The supplementary EIA (SEIA) procedures are ongoing for the remaining sections, and the ZRID decisions are expected in 2026. Based on the environmental documentation, parts of the alignment directly intersect four Natura 2000 sites - PLH320009 Jeziora Szczecineckie and PLH320022 Dolina Radwi, Chocieli i Chotli - along the Bobolice - Szczecinek section and PLH300001 Biedrusko and PLB300015 Puszcza Notecka along the Oborniki - Poznan Polnoc section. In addition, the project runs in proximity to several other Natura 2000 areas, including, PLB300013 Dolina Samicy, PLH300043 Dolina We?ny, PLB020001 Dolina Baryczy, PLH020041 Ostoja nad Barycz?, PLH300056 Buczyna w D?ugiej Go?linie and PLH300035 Baranów and possible others, but without direct intersection. The requirements of the Birds Directive (2009/147/EC) and the Habitats Directive (92/43/EEC) will be further checked during the Bank's appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation. Potential climate risks, the scope and adequacy of the applied adaptation measures for ensuring long-term resilience of the new road, and impact of the project implementation on the GHG emissions will be further assessed during the appraisal.

    The project was procured through eight design-build contracts, all awarded to Polish construction firms. The Bank during the appraisal will review if the Promoter has procured contracts for implementation of the project in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes