Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Fiche récapitulative

    Date de publication
    10 juin 2026
    Statut
    Référence
    À l'examen | 08/05/2026
    20250695
    Nom du projet
    Promoteur – Intermédiaire financier
    DANDARA SOLAR PV AND BESS
    SCATEC ASA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    not disclosed
    not disclosed
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The project concerns the construction and operation of a 1.1 GWp solar photovoltaic (PV) plant with a co-located 50 MW/200 MWh battery energy storage system (BESS) located in Qena, Egypt.

    The aim is to increase the production and storage of electricity from low-carbon sources (solar PV) and to address negative climate and environmental externalities — a market failure — through the reduction of carbon dioxide emissions and air pollution. The project contributes to Egypt’s Vision 2030 and Integrated Sustainable Energy Strategy (ISES) 2035, supporting the country’s commitment to achieve 42% of electricity generation from renewable sources by 2030. Additionally, financing this project is in line with the EIB’s lending priority objectives on energy (renewable energy), as well as the transversal objectives on climate action (mitigation) and environmental sustainability (pollution prevention and control). The project is expected to rely on a long-term corporate power purchase agreement (PPA) with Misr Aluminium Company (EgyptAlum) as the offtaker.

    Aspects environnementaux
    Passation des marchés

    The project is Categorised A in accordance with the EBRD Environment and Social Policy 2024 requiring the preparation of environmental and social impact assessment report including public consultation and stakeholder engagement. The ESIA package for phase 1, inclusive of Non-Technical Summary ("NTS"), Environmental and Social Action Plan (ESAP), Stakeholder Engagement Plan ("SEP") and Environmental and Social Management and Monitoring Plan ("ESMMP") have been disclosed on the EBRD and promoter's websites on March 4th 2026. Public consultation of the ESIA package with the surrounding communities took place in October 2025 and included a public hearing in Nagaa Hammadi. The results of the impact assessment indicate limited air emissions, minimal wastewater generation, and minor use of hazardous materials. Management plans will include dust control measures and waste handling procedures. Dry cleaning of PV panels will be used during operations to the extent possible, and specific actions regarding PV and BESS material sourcing, maintenance, and disposal will align with good international practices. There are no protected areas in the vicinity of the project area and no significant impact on biodiversity nor ecosystems has been identified in the ESIA. Extensive engagement with local authorities and adjacent communities has been undertaken by the promoter and a dedicated Community Liaison Officer will be hired before construction starts, responsible for the implementation of the SEP and management of external grievances throughout the lifetime of the Project. As the two phases are adjacent in a desert environment, E&S issues are unlikely to be materially different for the two phases. During appraisal, EBRD will assess compliance of Phase 2 with their Environmental and Social Requirements 2024.

    The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The project seems to be operating without exclusive or special rights, hence private sector procurement procedures should apply. This will be further assessed during appraisal.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Étapes
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes