Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    100 000 000 €
    Pays
    Secteur(s)
    Pays-Bas : 100 000 000 €
    Eau, assainissement : 100 000 000 €
    Date(s) de signature
    3/06/2026 : 100 000 000 €

    Fiche récapitulative

    Date de publication
    18 novembre 2025
    Statut
    Référence
    Signé | 03/06/2026
    20250345
    Nom du projet
    Promoteur – Intermédiaire financier
    PWN - SUSTAINABLE DRINKING WATER SUPPLY II
    PWN WATERLEIDINGBEDRIJF NOORD-HOLLAND NV
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 100 million
    EUR 339 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    Description
    Objectifs

    The project will co-finance part of the 2026-2029 investment programme of PWN, the fourth-largest water supply company in the Netherlands. The investments will extend and rehabilitate the drinking water distribution networks.

    The project aims to:(i) adapt to climate change to ensure sufficient quantity and quality of water supply to PWN's customers, (ii) reduce water losses to increase water and energy efficiency and thus mitigate climate change, (iii) meet the demands for water supply in the service area, thereby enhancing the quality of life for the population. The Bank aims to mitigate market failures in the water sector by financing infrastructure that will make a positive impact on the environment, public health and climate, which are not fully reflected in the current water tariffs.

    Additionnalité et impact

    The Project is aligned to the InvestEU eligible area of Environment and Resources, in line with the Annex II of the InvestEU Regulation. The Project concerns the co-financing of part of the 2026-2029 investment programme of the Provincial Water Company for North Holland (PWN) in the Netherlands, servicing a population of about 1.8 million. The operation comprises the extension and rehabilitation of the drinking water distribution network. The investments will increase the population receiving clean water and support the water utility to increase its water efficiency and support innovations in the circular economy. The Project contributes to the EU and EIB policy objectives of environmental protection and climate action, and will help mitigate market failures by financing infrastructure that generates positive environmental public health and climate externalities that are not fully reflected in the applicable water tariff in the service area.


    The Bank's financing stands out for its extended maturity and deferred repayment schedule, which suit the lengthy rollout of the project and match the asset's lifespan. It also provides adaptable disbursement options, allowing borrowers to choose between fixed or variable interest rates and tailor payment timing to project needs. The Project would not have been carried out (to the same extent) by the EIB without the InvestEU support.

    Aspects environnementaux
    Passation des marchés

    The investments will contribute to the sustainable operation and management of water supply infrastructure with overall positive environmental impacts. The project supports compliance with the EU Water Framework Directive (2000/60/EC), the Drinking Water Directive (2020/2184/EU 98/83/EC) and EU and national environmental legislation. It will contribute to climate action and environmental sustainability (CA&ES) objectives. The investments are expected to have limited environmental and social impacts. Whenever a formal Environmental Impact Assessment (EIA) is required, which is not expected at the time of this publication, a copy of the Environmental (and Social) Impact Study or the Non-Technical Summary (NTS) or equivalent document will be provided to the Bank and published on its website. The Promoter will also be required to verify that all investments financed by the Bank follow the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC. For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank information on the mitigating measures required to comply with the Habitats and Birds Directive.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    22 avril 2026
    3 juin 2026

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - PWN - SUSTAINABLE DRINKING WATER SUPPLY II
    Date de publication
    30 Apr 2026
    Langue
    Sujet général
    Prêts
    Numéro du document
    259449629
    Thématique du document
    Information Environnementale
    Numéro du projet
    20250345
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes