    Signature(s)

    Montant
    180 000 000 €
    Pays
    Secteur(s)
    Allemagne : 180 000 000 €
    Eau, assainissement : 28 620 000 €
    Transports : 59 220 000 €
    Énergie : 92 160 000 €
    Date(s) de signature
    15/12/2022 : 28 620 000 €
    15/12/2022 : 59 220 000 €
    15/12/2022 : 92 160 000 €

    Fiche récapitulative

    Date de publication
    22 août 2022
    Statut
    Référence
    Signé | 15/12/2022
    20210675
    Nom du projet
    Promoteur – Intermédiaire financier
    AUGSBURG PUBLIC INVESTMENTS
    STADTWERKE AUGSBURG HOLDING GMBH
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 180 million
    EUR 370 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    • Transports - Transports et entreposage
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    Investment programme of the local utility over several years in the sectors of energy, public transport and water.

    The objective of the operation is to support the renewal and continued development of key public infrastructure in the city of Augsburg.

    Additionnalité et impact

    The project contributes to natural resource efficiency and environmental protection, as well as to climate action throughout investments in the energy, transport and water sector. It is in line with the Bank's lending policies/orientation for these sectors and the European policy for the protection of the environment, in particular the objectives defined in the relevant Directives (Energy Efficiency, Renewable Energy, Water Framework, Urban Wastewater Treatment, etc.). The energy component contributes to maintaining or increasing security of supply and reduces carbon and air pollution externalities by enabling the integration of clean energy supply and increasing efficiency. The transport components contribute to climate action and reduce the externalities such local air pollution, noise, land take, congestion, greenhouse gases and accidents. The water component contributes to mitigating market failures in the sector by financing infrastructure which generates positive environmental and health externalities that are not fully internalised in water tariffs.


    The Bank's loan contributes to the stability and diversification of the Borrower's funding base. It allows the Borrower to draw down funds over a long period, matching the long implementation period of the project, and offers flexible repayment and interest rate options. The Bank's loan offers the Borrower an advantageous interest rate, reducing its funding costs and allowing it to dedicate more resources to the public services it provides.

    Aspects environnementaux
    Passation des marchés

    The environmental and social due diligence will focus on the Promoters' capacity to implement the investment programme in line with EIB's environmental and social standards and requirements, as well as national and EU legislation. The energy part of the programme comprises the implementation of district heating network infrastructure, as well as a number of electricity distribution schemes from low voltage up to 110 kV and renewable energy generation plants. These programme schemes are likely to fall under Annex II of the Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an environmental impact assessment (EIA). It is not expected that an EIA will be required for the transport components in the proposed programme. The water part of the programme mainly consists of the construction and rehabilitation of the water distribution network with house connections as well as the extension and rehabilitation of groundwater sources and a drinking water treatment plant. All components are expected to comply with the relevant EU directives (Drinking Water Directive 2020/2184 and Water Framework Directive 2000/60/EC). Some of the water schemes are likely to require an environmental impact assessment. Therefore, the Promoter will be required to comply with Directive 2014/52/EU amending the EIA Directive 2011/92/EU. The Promoter must also comply with the requirements of the Water Framework Directive, including Art 4(7) where appropriate. According to the available information, the sub-projects are not within or in the vicinity of any Natura 2000 zones. This will be further analysed during appraisal.

    The Bank will require the Promoter to ensure that contracts for implementation of the programme have been and will be tendered in accordance with the applicable EU procurement legislation, (Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - AUGSBURG PUBLIC INVESTMENTS
    Date de publication
    13 Dec 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    158318864
    Thématique du document
    Information Environnementale
    Numéro du projet
    20210675
    Pays
    Disponible au public
    Télécharger maintenant
    Évaluation des incidences environnementales et sociales - AUGSBURG PUBLIC INVESTMENTS - Umweltverträglichkeitsstudie
    Date de publication
    5 Oct 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    160972402
    Thématique du document
    Information Environnementale
    Numéro du projet
    20210675
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens
    Fiche récapitulative

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes