Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20250009
Date de publication: 28 mars 2025

Promoteur – Intermédiaire Financier

AZIENDA MOBILITA E TRASPORTI SPA

Lieu

Description

The project will finance the following investments for Genova's urban and suburban public transport services: (i) acquisition of 152 electric buses (ii) Installation of the associated charging infrastructure in five existing depots/terminals (iii) construction of 3 new depots for electric vehicles

Objectifs

The aim is to support the renewal and energy transition of the bus fleet towards full electrification, while enhancing the attractiveness of the public transport offering. This is expected to reduce operating costs and improve environmental performance, particularly by lowering air and noise pollution and reducing greenhouse gas emissions.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 40 million

Coût total (montant approximatif)

EUR 106 million

Aspects environnementaux

The construction of the 3 new depots, falls under annex II of the Directive 2011/92/EU as amended by Directive 2014/52/EU. Based on a risk-based approach as defined in the EIBG E&S Policy, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by EIA Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal. Manufacturing of rolling stock and the installation of the associated charging infrastructure inside the footprint of the existing depots does not fall within the scope of the Directive 2011/92/EU as amended by Directive 2014/52/EU. Therefore, no EIA is required for these components.

Passation des marchés

The promoter shall ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, (Directive 2014/25/EU as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

À l'examen - 14/03/2025

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Transports