    Référence: 20240425
    Date de publication: 25 juillet 2024

    Promoteur – Intermédiaire Financier

    TAGENERGY SA

    Lieu

    Description

    The project concerns the development, construction and management of a 240MW / 480MWh Battery Energy Storage System (BESS) in Cernay-lès-Reims, Marne, France.

    Objectifs

    The aim is to realise a utility scale BESS to provide additional flexibility resources and system services (frequency containment and restauration, balancing, and additional capacity for adequacy needs) to the French and European power systems. The project will enable the integration of renewables and will contribute to secure the system supply.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    not disclosed

    Coût total (montant approximatif)

    not disclosed

    Aspects environnementaux

    The project includes components that may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC). No major environmental or social impacts are expected for the envisaged project (including batteries systems and associated infrastructures).

    Passation des marchés

    The promoter has been preliminarily assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. In any case, the promoter has to ensure that the project will be implemented in accordance with the EIB's Guide to Procurement.

    Statut

    À l'examen - 27/06/2024

    Milestone
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Énergie