    The project concerns the deployment of an Electric Vehicle Charging (EVC) infrastructure network of 500 High Power Charging stations (HPC) across France, Germany, Belgium, the Netherlands and Luxembourg, over a 5-year period from 2019 until end of 2023. The infrastructure will consist of high power charging stations from 150kW up to 350kW. The charging stations will be public with open access and located on existing service station sites, along the TEN-T network.

    Objectifs

    The project will contribute to accelerate the transition towards lower carbon transport vehicles.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 194 million

    Aspects environnementaux

    The project components consist of connections to the distribution grid networks and the respective charging stations. They are expected to have limited environmental impact, which will typically be related to noise nuisance and disturbance during construction. After completion, no environmental impact is expected from the ordinary operation of the stations. No environmental impact assessment is required for the project, as it does not fall under either Annex I or Annex II of the EU EIA Directive. EV infrastructure in itself is not subject to environmental impact assessment processes under either Annex I or Annex II of the EIA Directive. However, the building of green field parking locations where the EV infrastructure is installed and/or connections to the grid may be screened in under Annex II. The Bank will require in those cases to be informed of the screening decision from Competent Authority. The project is expected to have a positive effect on the environment. The project will power electric vehicles with no emissions of pollutants and hence will contribute to meet air quality standards as set out by the European Union (EU) and the World Health Organization (WHO). The project will also contribute to reduce road transport noise pollution, as electronic vehicles (EV) are also much quieter than conventional vehicles. Finally, the project will have a significant impact on CO2 emissions reduction that will result from the replacement of conventional cars operating on fossil fuels with electric cars powered by less carbon-intensive electricity.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company and hence not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 29/06/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Belgique France Allemagne Luxembourg Pays-Bas Transports