Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190180
    Date de publication: 13 septembre 2019

    Promoteur – Intermédiaire Financier

    LANDKREIS HAMELN-PYRMONT

    Lieu

    Description

    The project is a new allocation under the framework loan "Breitband Niedersachsen" (2014-0404). It concerns the roll-out of a passive optical fibre access network (Fibre-To-The-Building or FTTB). By 2022, the network will provide advanced broadband services up to 1 Gbps to about 14 000 households and businesses located today in uncovered white spots.

    Objectifs

    The project contributes to the goal of the Gigabit society to provide access to all rural households to Internet connectivity, offering a bandwidth of at least 100 Mbps, upgradable to Gigabit by 2025. Furthermore, it supports the objective of the Electronic Communication Code to promote connectivity and access to, and take-up of, very high capacity networks, by all citizens and businesses.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 29 million

    Coût total (montant approximatif)

    EUR 58 million

    Aspects environnementaux

    Investments in fixed telecommunications projects (mainly civil works for fibre roll-out) do not fall under the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU. The related works have limited environmental effects, apart from disturbances during the construction phase, which can be mitigated by appropriate measures.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EC and/or 2014/24/EC, where applicable as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 25/10/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Télécom