Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180132
    Date de publication: 16 avril 2018

    Promoteur – Intermédiaire Financier

    BRATISLAVSKA VODARENSKA SPOLOCNOST AS

    Lieu

    Description

    The project consists of a new investment and the reconstruction of water and sewerage systems.

    Objectifs

    The key drivers of the investment plan are to connect currently unserved customers to the drinking water and wastewater network within its service area, maintain asset serviceability levels by targeted asset replacements and renewals, which will enable Bratislava's water company (BVS) to maintain its service and compliance levels and improve its operational performance and the efficiency of its assets.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 60 million

    Coût total (montant approximatif)

    EUR 120 million

    Aspects environnementaux

    The investments in the water and wastewater sector are expected to have positive net environmental and social impacts, considering their focus on compliance and resource efficiency. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EC, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU and Directive 92/13/EEC as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of European Union, as and where required.

    Statut

    À l'examen - 22/03/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Slovaquie Eau, assainissement