Date de publication: 10 septembre 2019
Promoteur – Intermédiaire Financier
SYNDICAT INTERCOMMUNAL D'ENERGIE ET DE E-COMMUNICATION DE L'AINLieu
Description
The project relates to the design, building, financing, operation and commercialization of an open access ultra high speed broadband telecommunications network initiated by Public Sector Entity (SIEA) under PIN (Public Initiative Network). This project is located in the Department of Ain, France.
Objectifs
The project relates to the design and rollout of a publicly owned open access VHC broadband network PIN (Public Initiative Network) in the Ain department, France. The objective of the project is to deploy a "Fibre to the Home" (FTTH) network covering, during the project implementation period, around 200 000 households, as well as to provide fibre-based connectivity to public sites. The access network will be deployed in areas where private operators are not providing very high speed broadband services due to lack of commercial interest and will therefore be commercialised on an open access basis to the private retail operators.
Secteur(s)
- Télécom - Information et communication
Montant BEI envisagé (montant approximatif)
EUR 120 million
Coût total (montant approximatif)
EUR 273 million
Aspects environnementaux
Investments in fixed telecommunications projects (mainly civil works for fibre rollout) do not fall under the EIA Directive 2014/52/EU amending Directive 2011/92/EC. The related works have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/24/EU as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 2/12/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).