Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170068
    Date de publication: 30 novembre 2017

    Promoteur – Intermédiaire Financier

    STOCKHOLMS KOOPERATIVA BOSTADSFOERENING

    Lieu

    Description

    The proposed project consists of the development of residential buildings supporting the Swedish strategy for the development of nearly zero energy buildings (NZEB).

    Objectifs

    The project will contribute to the deployment of energy-efficient residential buildings in Sweden, and is therefore in line with the EU bank climate action priority.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    SEK 550 million

    Coût total (montant approximatif)

    SEK 1143 million

    Aspects environnementaux

    Given the relative scale, location and nature of the individual schemes in built-up urban areas, all of the schemes are deemed not to have any significant negative environmental impact. Exceptionally, a scheme may fall under Annex II of the EIA Directive 2011/92/EU. In these cases the Bank will require the promoter to act according to the provisions of the aforementioned Directive as transposed into national law. The Bank will review relevant permits and environmental and social management processes during appraisal, including mitigation/compensation measures to be taken and any potential effects on nature conservation sites (Habitats Directive 92/43/EEC and Birds Directive 79/409/EEC).

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not operating in the utilities sector and not having the status of a contracting entity, thus not being subject to EU rules on public procurement. The procurement procedures to be employed by the promoter are in line with standard practice for the sector and are in the best interests of the project; hence, the main principles of value for money, transparency and objectivity are expected to be achieved.

    Statut

    Signé - 27/10/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Suède Services