Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160922
    Date de publication: 12 novembre 2020

    Promoteur – Intermédiaire Financier

    KENYA NATIONAL HIGHWAYS AUTHORITY

    Lieu

    Description

    Improvement to the A8 Highway in western Kenya, comprising of (i) the widening from 2 to 4 lanes over 175 km and (ii) the strengthening of 57 km of single carriageway, both part of the Northern Corridor linking the port of Mombasa - via Nairobi - to Kampala (Uganda).

    Objectifs

    The project aims to add capacity on 175 km of the A8 between Rironi and Mau Summit as well as strengthen 58 km of the A8 South between Rironi and Naivasha, which together are expected to generate economic benefits in terms of time savings, improved road safety and vehicle operating cost reductions. The project is part of a larger regional objective to develop the Northern Corridor linking the port of Mombasa - Nairobi - Kampala (Uganda). The multi-modal Northern Corridor is the busiest and most important transport corridor in East and Central Africa, providing a gateway through Kenya from Mombasa Port via road, rail and pipeline to the landlocked countries of Uganda, Rwanda, Burundi, South Sudan and Eastern Democratic Republic of the Congo.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 1266 million

    Aspects environnementaux

    If located within the EU, the project would fall under Annex I of Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, and therefore be subject to a full environmental impact assessment (EIA) procedure. An EIA has been carried out in accordance with applicable national legislation and the competent authority issued an environmental license in May 2020. Environmental and social aspects, management measures and procedures as well as alignment of the project with EIB Environmental and Social standards and provisions of the relevant national legislation are to be reviewed during appraisal.

    Passation des marchés

    The Promoter has been selected after an international competition. The Bank will review the selection procedure to confirm compliance with the EIB Guide to Procurement.

    Statut

    Approuvé - 16/12/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Kenya Transports