    Référence: 20140563
    Date de publication: 6 février 2017

    Promoteur – Intermédiaire Financier

    ADMINISTRACION NACIONAL DE ELECTRICIDAD

    Lieu

    Description

    The project is an investment programme which aims to enhance Paraguay's electricity distribution and transmission system in different areas of the country.

    Objectifs

    The programme will improve the safety and reliability of electricity supply to the population of the concerned areas and also adapt the network to the growing demand.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Garantie au titre du MPE

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Montant BEI envisagé (montant approximatif)

    USD 94 million (EUR 89 million)

    Coût total (montant approximatif)

    USD 195 million (EUR 184 million)

    Aspects environnementaux

    If located in the EU, some programme components would fall under Annex II of the Environmental Impact Assessment (EIA) Directive requiring the competent authority to determine the need for a full environmental impact assessment. The vast majority of the programme components relate to medium or low voltage extensions and reinforcements, works in existing substations, underground high voltage lines and refurbishment, that are expected to have a limited environmental impact. Based on preliminary information and considering the technical characteristics of the programme, none of the programme components are expected to require a full EIA. The main impact that can typically be expected from the proposed activities relate to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance and disturbance during construction. Environmental & social (E&S) aspects will be reviewed during appraisal to ensure alignment with Bank's E&S requirements.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project is done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 11/12/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).