Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130489
    Date de publication: 15 octobre 2014

    Promoteur – Intermédiaire Financier

    NATIONAL UNIVERSITY OF IRELAND MAYNOOTH

    Lieu

    Description

    Capex development programme of the National University of Ireland, Maynooth, located in County Kildare.

    Objectifs

    The purpose of the project is to construct and refurbish teaching, research and supporting facilities of the National University of Ireland Maynooth (NUIM). The project will include construction of a new university library, an ICT teaching and research facility, a building for educational sciences and student accommodation and service buildings. The aims are to increase the quality of teaching, learning and academic research at the university by updating the facilities. The ultimate beneficiaries are the students and staff of the university as well as the eventual employers of the graduates and wider society in Ireland.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 77 million

    Coût total (montant approximatif)

    EUR 160 million

    Aspects environnementaux

    Universities and research institutions are not specifically mentioned in the directive on Environmental Impact Assessment (EIA). An EIA is therefore not required in accordance with the EIA Directive 2011/92/EU. However, parts of the investment cover the construction of new facilities and therefore may be covered by Annex II of the directive in relation to urban development. The Bank’s services will verify during appraisal whether an EIA is required for any component of the project. Potential impacts on Natura 2000 conservation sites as well as operating procedures and systems related to animal testing, genetically modified organisms (GMOs), biosafety hazards and waste management will also be checked.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EEC and/or 2004/17/EEC as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 17/12/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Éducation