    Référence: 20130184
    Date de publication: 1 juillet 2015

    Promoteur – Intermédiaire Financier

    PJSC UKRHYDROENERGO

    Lieu

    Description

    Construction of a hydropower pumped storage plant in Central Ukraine with an installed capacity of 1,000 MW.

    Objectifs

    The project will have multiple benefits, including substituting for energy currently generated inefficiently by intermittent operation of oil and gas-fired thermal power plants, thereby producing significant savings in fuel, carbon emissions and maintenance costs. The project will also improve the security of supply by providing 1 000 MWe of dispatchable reserve capacity as well as additional frequency and voltage control capability. This will help Ukraine stabilise its power system, contribute to security of supply in Ukraine and thus facilitate possible future interconnection of the Ukrainian system with the ENTSO-E Continental European power system.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 400 million

    Coût total (montant approximatif)

    EUR 1282 million

    Aspects environnementaux

    If located within the EU, the project would be classified as an Annex I project under Directive 2011/92/EU, requiring a full environmental impact assessment (EIA). EIA and public consultation procedures have been carried out in accordance with national legislation and received approval from the competent authority in March 2013. The EIA procedures and environmental management plan will be reviewed during appraisal in order to ensure that the project complies with the Bank's requirements.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be carried out in accordance with the Bank's Guide to Procurement.

    Statut

    À l'examen - 19/06/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).