Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130179
    Date de publication: 5 juin 2013

    Promoteur – Intermédiaire Financier

    Italy’s main gas transmission company and the largest listed regulated utility in Europe.

    Lieu

    Description

    The project concerns the connection of a newly constructed gas transmission pipeline between Zimella and Cervignano d'Adda to around 65 existing large consumers and off-takers in northern Italy (overall length of connections is some 80 km) as well as the removal of old pipeline sections over a total length of around 188 km and the replacement of 4 gas turbines at the Messina compressor station, in order to reduce pollution to ambient air.

    Objectifs

    Replacement of gas transmission pipelines and related facilities is necessary to maintain and improve service and safety standards in the Italian gas network, and to provide for changes in gas demand and flow patterns in the end-consumer markets. The financing of this project would thus contribute to the security of regional energy supply and to network modernisation for maintaining quality and reliability. Furthermore, increasing penetration of gas in all sectors will displace less efficient and more polluting sources of energy, thereby contributing to European Community objectives of rational use of energy and environmental protection.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 65 million

    Coût total (montant approximatif)

    EUR 165 million

    Aspects environnementaux

    The pipeline components of the project have been subject to an environmental impact assessment that was approved by the competent authority in 2011. The replacement of the Messina compression turbines, within the existing compressor station and without changes in size, did not require an Environmental Impact Assessment (EIA), but a new industrial emission license, which has been granted.

    Passation des marchés

    The investments under the project are subject to the procurement provisions defined in Directive 2004/17/EC and its amendments for entities operating in the water, energy, transport and postal services sectors.

    Statut

    Signé - 24/10/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Énergie