    Référence: 20130098
    Date de publication: 1 août 2013

    Promoteur – Intermédiaire Financier

    RAILWAY PROCUREMENT AGENCY

    Lieu

    Description

    The project consists of a 5.6 km extension of the Dublin's LUAS light rail system including 13 additional stations, a new depot and the purchase of 10 additional trams. The project will allow the connection between the two existing LUAS red and green lines in the inner city centre.

    Objectifs

    A connection between the two existing LUAS red and green lines in the inner city centre would be made. The project is expected to further increase the attractiveness of the public transport network, improving accessibility while optimising costs and ensuring a sound environmental performance.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 163 million

    Coût total (montant approximatif)

    EUR 326 million

    Aspects environnementaux

    The project falls under Annex II of the EU EIA Directive, according to which the need for a full EIA is decided either on a case-by-case basis by the Competent Authority or on pre-established criteria set by the Member State. In this case an Environmental Impact Assessment has been carried out including public consultation. Further details on the compliance of the project with EU Directives on the environment, including EIA Directive 2011/92/EU, SEA Directive 2001/42/EC, Habitats Directive 92/43/EEC and Birds Directive 79/409/EEC will be analysed during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC/ and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 3/03/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).