    Description

    The project is part of ASECNA's investment plan for the period extending to 2013 (Plan de Services et d'Equipements (PSE) 2009-2013). The project focuses on upgrading and extension of ASECNA’s Air Traffic Control facilities.

    Objectifs

    The project is designed to enhance the safety, efficiency and reliability of the Air Traffic Control (ATC) facilities in the ASECNA air space.

    Commentaires

    More generally, ASECNA’s strategic plan aims at:
    - improving flight safety and reliability in its airspace
    - improving governance and economic efficiency

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 40 million

    Coût total (montant approximatif)

    Around EUR 86 million

    Aspects environnementaux

    The project is ostensibly an upgrade to the promoter‘s already existing Air Traffic Control systems. Some infrastructure and or construction may have to be developed but on existing facilities. Thus an EIA in compliance with the requirements of the EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC is not required. Compliance with relevant environmental legislation will be verified during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement directives, with publication of tender notices in the EU Official Journal, as and where appropriate and will examine the procurement procedures during appraisal.

    Statut

    Signé - 29/11/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Régional - Afrique Transports