    Référence: 20100270
    Date de publication: 21 janvier 2011

    Promoteur – Intermédiaire Financier

    Południowy Koncern Energetyczny SA

    Lieu

    Description

    The project concerns the construction and operation of a new biomass-fired boiler (approximately 140 MWth), to replace one of the existing coal fired boilers that will be decommissioned due to obsolescence, and the refurbishment of an existing steam turbine (approximately 50 MWe) and auxiliary infrastructure. The project will be located within the boundaries of the existing Jaworzno III Power Plant and is intended to operate primarily for the production of electricity, whilst at the same time facilitating compliance with renewable energy supply regulations.

    Objectifs

    The project will contribute to meeting electricity demand using a renewable source, thus replacing fossil fuel generation and contributing to increase security of electricity supply. Moreover, the project will renew the thermal power reserve in the existing cogeneration plant, thus providing a back-up for the plant’s basic heat system which supplies hot water to the connected district heating network.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to PLN 210 million (ca. EUR 53 million)

    Coût total (montant approximatif)

    Estimated amount: PLN 424 million (ca. EUR 108 million)

    Aspects environnementaux

    The project falls under Annex II of Directive 85/337/EC and has undergone a full Environmental Impact Assessment (EIA). The project has received the environmental permit from the competent authority. The results of the EIA show that the plant, which will be built within the boundaries of an existing facility, is not expected to have a negative impact on any site of nature conservation.

    Passation des marchés

    The promoter is a public undertaking and follows public procurement procedures in compliance with the Directive 2004/17/EC and with the Polish Public Procurement Act. The promoter’s approach for the procurement of works, goods and services will be further evaluated during the appraisal.

    Statut

    Signé - 24/10/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Énergie