    Référence: 20100228
    Date de publication: 7 septembre 2010

    Promoteur – Intermédiaire Financier

    Greater Gabbard Offshore Winds Limited, a joint venture between RWE and SSE.

    Lieu

    Description

    The project concerns the implementation and operation of a 504 MW offshore wind farm. The project is located between 23 km and 45 km off the coast of Suffolk and will consist of 140 3.6 MW wind turbines.

    Objectifs

    The project aims at enabling the UK to achieve its ambitious target of energy consumption based on renewable energy sources in 2020.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to GBP 500 million.

    Coût total (montant approximatif)

    GBP 1 387.50 million.

    Aspects environnementaux

    The project falls under Annex II of Directive 85/337/EEC (as amended by 97/11/EC) on Environmental Impact Assessment (EIA). In this case, a full EIA was carried out for both the offshore and the onshore works. Planning consent for both onshore and offshore works was granted in early 2007.

    Passation des marchés

    The promoter is not subject to EU procurement directives (Utilities Directive 2004/17) for the purchase of the project’s equipment as the concession to build an offshore wind farm was granted following a competitive tender (Round 2) launched by the UK government. The promoter however has suitable procurement and purchasing procedures in place, which allow an appropriate selection of works, goods and services offered at competitive prices. The project will be delivered on a multi-contract basis, which is a common approach for offshore wind farms. The selected suppliers are reputable companies with substantial offshore experience.

    Statut

    Signé - 20/09/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Énergie