Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090648
    Date de publication: 24 août 2010

    Promoteur – Intermédiaire Financier

    Contact point: RDA, Mr Elias Mwape, Chief Engineer – Planning
    Phone +260 211 253 088 or +260 211 253 002/ Fax: +260 211 253 404 e-mail: emwape@roads.gov.zm.

    Lieu

    Description

    Improvement of about 360 km of single carriageway highway on the Great East Road connecting central Zambia to its eastern province, as well as into the “Nacala Development Corridor”, a regional transport corridor linking Malawi and Zambia to the deep water port of Nacala in Mozambique.

    Objectifs

    The project is expected to generate savings in vehicle operating costs and travel time as well as reduce the risk of road accidents. The project feeds the Nacala Corridor, which, when fully upgraded, will offer a significantly shorter route to/from the sea for Zambian imports and exports than other existing routes through South Africa and Tanzania. The EIB contribution is expected to include the works for developing a dry port (road-rail interconnector) in Chipata.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 80 million.

    Coût total (montant approximatif)

    Indicative amount: EUR 250 million.

    Aspects environnementaux

    An EIA procedure, in accordance with applicable standards, was undertaken and submitted to the Competent Authority (Environmental Council of Zambia, ECZ) for approval. In its letter dated 9th July 2010, the ECZ approved the present project.

    Passation des marchés

    The promoter is a public authority and, if operating as a contracting entity in the EU, would be subject to the provisions of the public procurement Directive 2004/18. The promoter will therefore be required to undertake procurement in accordance with the EIB Guide to Procurement which imposes the main mechanisms of the EC Directives.

    Statut

    Signé - 8/12/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Zambie Transports