Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090635
    Date de publication: 11 mai 2012

    Promoteur – Intermédiaire Financier

    This is a public sector operation. The loan will be signed by the Council for Development and Reconstruction, acting on behalf of the Government of Lebanon.

    Lieu

    Description

    Rehabilitation and widening to three lanes plus a service lane of the dual carriageway section of the A1 (which connects Beirut to the second largest city of Lebanon, Tripoli) between Nahr-El-Kalb and Tabarja, some 10.3 km long.

    The project also entails the construction of two other major interchanges in Beirut (Galerie Semaan and El-Mawared).

    Objectifs

    The proposed rehabilitation and widening project would increase the capacity of the corridor that connects Beirut to Tripoli and the population of the Metn villages, towards Kesrwan, Jbeil and surroundings, with the urban areas and infrastructure of the capital.

    Commentaires

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 75 million

    Coût total (montant approximatif)

    EUR 150 million

    Aspects environnementaux

    If the project was located in the EU, it would fall under Annex II of the Directive 2011/92/EU since it is a widening to 2x3 plus one extra service lane some 10.3 km long. The intersections, depending on the area of land take and/or whether they lie on an expressway/motorway, may be Annex I. Notwithstanding the promoter has advised that the project was screened and an Environmental Impact Assessment has been done. The environmental and social procedures will be reviewed during the project appraisal. Clarity would also be sought on whether land take involves involuntary resettlement and the need to develop a resettlement action plan in accordance with the Bank's standards and whether any protected natural habitats are impacted by the project.

    Passation des marchés

    The Bank will require that the promoter implements the project in accordance with EIB procurement guidelines. The contracts for design and civil works will be procured through the Lebanese Council for Development and Reconstruction (CDR).

    Statut

    Signé - 21/12/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Liban Transports