Date de publication: 14 octobre 2009
Promoteur – Intermédiaire Financier
Industrial Development Bank of Turkey (TSKB)Development Bank of Turkey (TKB)
Lieu
Description
The operation follows the successful implementation of the initial facility signed in 2008. It will be dedicated to financing environment and energy investments in Turkey through a framework loan structure.
Objectifs
Sub-projects financed through the facility will be small to medium sized investments with a total cost up to EUR 50m. The new facility mainly targets renewable energy, energy efficiency and pollution abatement investments as well as other investments with a significant positive environmental impact.
Commentaires
Protection of Environment
Energy Projects excluding TENs
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 300.00 million
Coût total (montant approximatif)
Up to EUR 600.00 million
Aspects environnementaux
All investments financed from the resources made available by the Bank are required to comply with the relevant national legal framework and with the EU environmental policy and the environmental acquis, as appropriate and in particular the EIA Directive (as amended), the Habitats and Birds Directives and the relevant sectoral environmental legislation, in such a way that the main principles and requirements of the EU EIA Directive will be fully respected.
Passation des marchés
The legal documentation will oblige the intermediaries to ensure where public tendering is required by national or applicable EU regulations, procurement procedures are done in accordance with EIB Guidelines.
Statut
Signé - 10/12/2009