Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090529
    Date de publication: 11 janvier 2010

    Promoteur – Intermédiaire Financier

    Companhia de Gás de São Paulo (Comgás)

    Lieu

    Description

    The project comprises the rehabilitation, expansion and operation of gas distribution grids in the Promoter’s concession area (the greater São Paulo region).

    Objectifs

    The project includes primarily the construction of low pressure distribution pipelines in order to connect new residential and commercial gas consumers to natural gas. The project will also include rehabilitation measures to reduce gas losses, such as replacing or repairing of connections, meters, pipes and regulator stations, i.e. typical equipment in gas grids that are important for operational safety.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 652 million

    Aspects environnementaux

    The various sub-projects under the programme are expected to have technical characteristics corresponding to Annex II of the Directive 85/337/EC and its amendments. The promoter confirmed the investments to be located primarily within populated areas with no particular environmental sensitivity. Like in Europe individual EIAs are not required for the expansion of existing gas distribution grids if certain technical characteristics are not exceeded, as the case here according to the promoter.

    Link to EIAs on the Comgás website:

    Passation des marchés

    Gas distribution in the State of São Paulo has undergone a privatisation process in 1999 after wide international competition among suitable companies and consortia. The promoter won the process and the related concession. Procurement follows in-house procedures that require interested companies to pre-qualify for required works, equipment and services.

    Statut

    Signé - 26/03/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Brésil Énergie