Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090513
    Date de publication: 26 février 2010

    Promoteur – Intermédiaire Financier

    Ford Motor Company Ltd

    Lieu

    Description

    The project concerns the financing of:
    i) RDI activities relating to the development of new, cleaner engine technologies under EIB’s European Clean Transport Facility (“ECTF”);
    ii) RDI activities related to the development of a new generation of commercial vehicle and investments in production facilities for a new downsized engine family in Bridgend, located in South West Wales in the UK.

    Objectifs

    The project will contribute to the promoter’s long-term competitiveness and to the market introduction of low-carbon-emission vehicles. It is expected to bring about positive environmental results in reducing fuel consumption, CO2 and regulated emissions. Part of the investment will also fund capital expenditure for modernising the Bridgend plant to produce downsized engines, emitting less CO2.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    GBP 247 million. for ECTF investment and GBP 203 million. for selected investments related to commercial vehicle development and modernising the Bridgend plant.

    Coût total (montant approximatif)

    Approximately GBP 1 billion.

    Aspects environnementaux

    The project is expected to be mainly carried out at the promoter’s existing facilities, already authorised. It is therefore unlikely that an EIA will be required, as per EIA Directive 85/337/EC, amended by Directives 97/11/EC and 2003/35/EC. To be assessed during appraisal.

    Passation des marchés

    The promoter is a private company operating in the manufacturing sector not covered by EU Directives on procurement. Procurement is expected to be in line with EIB guidelines for private sector projects.

    Statut

    Signé - 12/07/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Industrie