Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090497
    Date de publication: 4 mai 2010

    Promoteur – Intermédiaire Financier

    The City of Poznan

    Lieu

    Description

    The project consists of 14 schemes, of which 6 major urban road schemes (reconstruction and extension of inner city roads and inner-city bypass, partly in connection to Euro 2012), 3 tram schemes (including light railway extension) and 5 hospital schemes already included in the Poznań City development Plan 2005-2010. The Project is a consequence of long-term investment plans (fast tram – since the 1970s) of the City and its goal to increase its attractiveness to business (better connection to Airport).

    Objectifs

    The selected schemes are part of the City’s Development Plan and are expected to contribute to the development strategy of the City of Poznań, improving accessibility through an increase in the road capacity and the reduction of congestion, improving the quality of life.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to PLN 600 million. (approx. EUR 148.28 million.)

    Coût total (montant approximatif)

    Estimated at PLN 1 500 million. (EUR 375 million.)

    Aspects environnementaux

    Poland, as a member State, has to comply with the relevant EU Directives concerning the environment. The Bank will require compliance with the EIA Directive 85/337/EEC amended by Directives 97/11/EC and 2003/35/EC, for every single scheme included in the project. This aspect will be further checked during appraisal, together with the question of the project falling within a plan or a programme requiring a Strategic Environmental Assessment (SEA) in line with Directive 2001/42/EC. Compliance with the EU Directive on the Energy Performance of Buildings (EU Directive 2002/91/EC) and its recast (approval expected during 2010) will be further examined during appraisal.

    Compliance with the EU Habitats Directive 92/43/EEC and EU Birds Directive 79/409/EEC will be required by the bank.

    Passation des marchés

    EU Directives (2004/18/EC and 2004/17/EC) on procurement have been transposed into national Polish legislation. Tenders shall be organised in compliance with EU requirements, with publication of tender notices in the EU Official Journal for projects above thresholds. Application of EU procedures by the Polish authorities for the tender of services, supplies and civil works will be reviewed by the Bank’s services during appraisal.

    Statut

    Signé - 30/07/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports Santé