Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20090266
Date de publication: 10 mars 2010

Promoteur – Intermédiaire Financier

The Promoter is MPK Krakow (MIEJSKIE PRZEDSIEBIORSTWO KOMUNIKACYJNE SA), the public transport company of Krakow, which owns and operates buses and trams. MPK is 100% owned by the Krakow municipal holding Company (Krakowski Holding Komunalny SA), which owns also MPWIK, Krakow Water Company, and MPEC (district heating company).

Lieu

Description

The project consists of the modernisation and extension of the tramway network in the Municipality of Krakow, including the purchase of 24 new trams.

Objectifs

The improvement of Krakow’s basic infrastructures such as in primis the transport system (both public and private). The improvement and upgrading of municipal infrastructures is a condition both for the city’s continuing sustainable social and economic development, and for improving its attractiveness to investors, whilst simultaneously improving the quality of life, upgrading the urban environment and developing the existing resources such as the relevant cultural and historical attractions.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 33.69 million.

Coût total (montant approximatif)

EUR 89.85 million.

Aspects environnementaux

Poland, as a Member State, is obliged to follow the relevant EU rules in relation to the environmental impact of projects (namely SEA, EIA and Habitat/Natura 2000 Directives). The new EIA Polish law, which is fully compliant with EU Directives, entered into force in November 2008.

Tramway Projects concerning infrastructure usually fall under Annex II of Directive 85/337/EC (as amended), and therefore competent authorities decide on a case-by-case analysis if a full EIA has to be carried out or not, while the acquisition of rolling stock falls outside the scope of the same Directive. Details will be checked at appraisal stage.

Passation des marchés

The promoter is a public entity subject to EU public procurement regulations. The Bank will require the promoter to ensure that contracts for the implementation of the Project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (mainly Directive 2004/17/EEC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate. All the details will be checked at appraisal stage.

Statut

Signé - 17/09/2010

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Transports