Date de publication: 15 juin 2009
Promoteur – Intermédiaire Financier
REN Gasodutos SA
REN Atlântico SA
REN Armazenagem SA
Lieu
Description
The project consists of three schemes: the expansion of the LNG-Terminal in Sines, the construction of a compressor station at Carregado and the expansion of the Carriço underground storage.
Objectifs
To support the beneficiary’s investment plan which aims at reinforcing and extending the natural gas system throughout Portugal.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 150 million.
Coût total (montant approximatif)
Estimated at EUR 300 million.
Aspects environnementaux
The project schemes (with the exception of the compression station) need environmental assessments as required in the EIA Directive 85/337/EC and amendments of 1997 and 2003. By their technical characteristics all schemes fall under Annex I or II of the directive.
Passation des marchés
Investments under the project are subject to the procurement procedures as defined in Directive 2004/17/EC for entities operating in the water, energy, transport and postal services sector.
Statut
Signé - 28/07/2009
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).