Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090229
    Date de publication: 20 octobre 2009

    Promoteur – Intermédiaire Financier

    Luka Koper Pristaniski in Logisticni Sistem DD

    Lieu

    Description

    Infrastructure projects in the Port of Koper consisting of:

    • Construction of a 146m long new quayside (berth7C) within the PierI Container Terminal.
    • Supply and installation of four new cranes for servicing post-Panamax vessels of up to 350m in length within berths 7B (existing) and 7C (new).
    • In-filling and paving of hinterland lagoons behind berths 7A and 7B.
    • Construction of hinterland storage facilities at berth7C.
    • Acquisition of equipment and machinery

    Objectifs

    Loan to support infrastructure projects in the Port of Koper, in particular extension of Pier 1, to increase capacity of the only Sloveniain port located in the northern Adriatic Sea.

    Commentaires

    N/A

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 135 million

    Aspects environnementaux

    A formal EIA is required in compliance with the EU EIA Directive 85/337/EEC. Compliance with the EIA Directive 2003/35/EC, biodiversity assessment requirements and status of environmental studies, consultations and authorisations will be reviewed during appraisal.

    Passation des marchés

    Luka Koper d.d. is the contracting authority for design, tender, implementation and supervision of the various project components. The works and the supply of equipment will be realised or installed by private contractors/suppliers on the basis of public tendering (including publication in the OJ of the EU Official Journal, if appropriate) – to be confirmed at appraisal.

    Statut

    Signé - 6/04/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Transports