Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090185
    Date de publication: 4 juin 2009

    Promoteur – Intermédiaire Financier

    Republic of Hungary, acting through the Ministry of Transport, Telecommunication and Energy.

    Lieu

    Description

    Design, build, finance and operation (DBFO) of a new road from Nyíregyháza to Vásárosnamény (46km) on the M3 corridor, connecting Budapest with the Ukrainian border.

    Objectifs

    The project is part of the National Action Programme for Growth and Employment (2008-2010), the objective of which is, inter alia, to develop missing infrastructure with a particular focus on Pan-European transport corridors.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to 50% of senior debt, however not higher than 50% of the Project costs.

    Coût total (montant approximatif)

    To be determined.

    Aspects environnementaux

    According to EU directive 85/337/EEC the project falls into the Annex I category and therefore an EIA is mandatory. The project will be required to comply with the relevant national legislation and to be in line with EU environmental policy and acceptable to the EIB. In particular, compliance with Directive 97/11/EC and 2003/35/EC, amending 85/337/EEC, the Habitats Directive 92/43/EEC, the Birds Directive 74/409/EEC and SEA Directive 2001/142/EC will be verified during appraisal.

    Passation des marchés

    The contracting authority is a public promoter obliged to comply with the European Directives 2004/17/EC and 2004/18/EC of 31 March 2004 and National Public Procurement legislation. The tender of the project was published in the Official Journal of the European Union on 23 December 2008 under registration number TED 2008/S 249-331922 and the process is currently expected to be completed by October 2009.

    Statut

    Signé - 19/12/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Hongrie Transports