Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090170
    Date de publication: 17 juin 2009

    Promoteur – Intermédiaire Financier

    To be defined at a later stage.

    Lieu

    Description

    The project consists of a cross-border railway tunnel of approximately 55.5 km crossing the Alps between Innsbruck (Austria) and Fortezza (Italy) to be used for freight and high speed passenger transport. The project in a wider sense also will have to comprise the implementation of major additional infrastructures on both its northern and southern access routes between Munich and Verona.

    Objectifs

    The project will provide a shorter and more efficient alternative to the existing (above ground-level) pass route and should lead to a modal shift from road to rail.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 1.8 billion.

    Coût total (montant approximatif)

    An estimate of total project cost will be provided at a later stage.

    Aspects environnementaux

    The project falls under Annex 1 of the EU Directive 85/337/EEC. Compliance with all applicable EU and national environmental legislation on environment will be verified during appraisal, with particular focus on the following:

    • SEA (Strategic Environmental Assessment), in accordance with EU Directive 2001/42;
    • EIA (Environmental Impact Assessment), in accordance with Directive 85/337/EEC (and following amendments Directive 97/11/EC and 2003/35/E);
    • Nature Conservation, in accordance with EU Habitat Directive 92/43/EEC (especially Articles 6, 10 and 12) and EU Birds Directive 74/409/EEC.

    Passation des marchés

    The Bank will require the Promoter to ensure that the contracts related to the project have been or shall be tendered in accordance with EU public procurement procedures.

    Statut

    À l'examen - 17/06/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Transports