    Promoteur – Intermédiaire Financier

    Iberdrola S.A.

    Lieu

    Description

    The project concerns the capacity increase of three existing hydropower plants (HPPs), La Muela, San Esteban and San Pedro with the installation of additional turbines on the existing sites. La Muela, located in the province of Valencia, on the Jucar basin, would more than double its capacity (from 636 MW to nearly 1500 MW) with 4 new Francis reversible turbines. San Esteban and San Pedro, both located in the province of Ourense, on the Sil basin, will increase their combined capacity from 296 MW to nearly 500 MW. The investment concerns mainly electromechanical equipment (turbines, generators, transformers, etc) installation, and underground civil works (water intakes, penstock tunnels, turbine caverns, etc.) None of the capacity increases will entail any extension of the dams or any additional flooding.

    Objectifs

    The project will expand the cost-effective production of renewable energy from existing hydropower plants, and complement the power output during peak periods and storing, with the use of low-cost off-peak electricity. As such, it is in line with EU renewable energy policies and will support Spain in meeting its commitments with respect to greenhouse gas emissions reductions.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 300 million.

    Coût total (montant approximatif)

    Estimated to be around EUR 600 million.

    Aspects environnementaux

    All project schemes are expansions of already existing hydropower plants, which were built years before the creation of the Natura 2000 network. Subsequently, the areas around the sites of the HPPs were classified as Natura 2000 sites and thus the sub-schemes are subject to a mandatory EIA according to national legislation. Permits were granted for two of the schemes, requiring measures to mitigate impacts from construction works on avifauna and vegetation. Details to be reviewed during appraisal.

    Passation des marchés

    The promoter is a contracting entity in the sense of the Utilities Directive 2004/17/EC. Therefore, the promoter is required to tender works, supplies and services contracts following public procurement rules, including the publication in Official Journal of EU (OJEU) where appropriate. Details of the procedures applied by the promoter will be reviewed during the appraisal.

    Statut

    Signé - 13/11/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie