Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090011
    Date de publication: 17 avril 2009

    Promoteur – Intermédiaire Financier

    A global player in the telecommunication sector.

    Lieu

    Description

    The project concerns the rollout of advanced broadband services in Germany, based on a mixture of fibre and copper technologies. This rollout will partly be undertaken jointly with the fixed line incumbent operator to increase coverage and reduce costs.

    Objectifs

    The future plans include the coverage of a significant share of German households with an advanced broadband technology allowing for much higher download speeds than possible today. The ultimate target is to enable the provision of an improved multiplay service offer to open up new revenue sources and compete more effectively against the cable operators.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 425 million.

    Coût total (montant approximatif)

    EUR 850 million.

    Aspects environnementaux

    Investments in fixed telecommunications projects (including civil works investments for fibre roll-out and transmission systems) do not fall under Annex I or II of Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC. Fixed telecommunications systems have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures.

    Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EEC).

    Passation des marchés

    According to utility directive 2004/17/EC the Telecom sector is exempt from public procurement procedures due to its competitive nature. Hence the purchasing of the private promoter is no longer regulated. The effectiveness of the applied procedures will be assessed during appraisal.

    Statut

    Signé - 15/09/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Télécom