Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080646
    Date de publication: 6 février 2009

    Promoteur – Intermédiaire Financier

    Private Investors

    Lieu

    Description

    The project concerns the installation and operation of a 52 – 54 MWp Solar Photovoltaic Plant in the Brandenburg area, eastern Germany. The project area is in a protected area that is also a former military practice area contaminated with explosives and chemicals that require remediation. The project will pay a rental fee that will be used for part-financing the decontamination of the project site. Electricity will be fed into the grid. The PV plants will benefit from a guaranteed feed-in tariff.

    Objectifs

    The development of renewable energy capacity supports national and European targets for renewable energy and contributes to security of energy supply and to environmental objectives, particularly to fighting climate change. Electricity generation from photovoltaic sources will displace fossil fuel-fired generation and the associated emissions of CO2, NOX and SO2.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    50% of Total Investment Costs.

    Coût total (montant approximatif)

    Depending on the final size, approx. EUR 150 million.

    Aspects environnementaux

    The project falls under Annexe II of the EIA Directive and is subject to an EIA based on a case-by-case decision by the competent authority. The project is situated in a SPA-Bird Habitat Protected Area. The site is also a contamination hot spot within a former military practice area requiring site remediation. In this case, an EIA and a specific biodiversity assessment study have been conducted and a permit has been granted. Further details, including compensation and mitigation measures required to ensure coherence with the Natura 2000 network, will be verified during appraisal.

    Passation des marchés

    Neither the promoter nor the project company are subject to EU Procurement Directives. In line with its principles and its Statute, the Bank will however ensure that suitable procurement procedures, including an appropriate selection of works, goods and services offered at competitive prices will be applied by the promoter and/or the special purpose companies. Details will be verified during appraisal.

    Statut

    Signé - 2/11/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Énergie