    Référence: 20080546
    Date de publication: 31 mars 2009

    Promoteur – Intermédiaire Financier

    Koridor X, doo Beograd
    Vlajkoviceva 19a
    11000 Belgrade
    Serbia

    Lieu

    Description

    Construction of a new 36 km section of motorway on Pan-European Corridor X in Serbia between Nis and Ciflik.

    Objectifs

    The project is expected to reduce travel times, vehicle operating costs, road accidents as well as potentially vehicle emissions, as a result of improved average speeds and infrastructure of a higher quality.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 195 million

    Coût total (montant approximatif)

    Around EUR 391 million

    Aspects environnementaux

    If located within the EU, the project would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC thus requiring a full EIA, including public consultations. EIA has been carried out at section level, following the evolution of the design process, and some of the approvals were obtained in accordance with the Serbian Law which is in line with the principles of the EU directive. Subsequent to IFI's involvement in the project financing, a consolidated study for all the 5 sections up to the border with Bulgaria was performed and made available to the public for further consultations.

    The project does not cross any nature conservation area and the studies performed show that the impacts on the adjacent conservation areas are not significant if the mitigation measures are respected. The overall social impacts of the project, especially the resettlement and compensation due to land acquisition, have been assessed under a separate study - Resettlement Policy Framework - in parallel with the consolidated EIA.

    No vulnerable people have been identified in the area of the project. The Resettlement Action Plans are being prepared for each section as the detailed design is advancing. The permitting processes for each section are in different stages and before first disbursement for each section, the Promoter shall have submitted the relevant approvals, permits and documents. Subject to receipt of the above mentioned confirmations, the project is acceptable for Bank's financing.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the Project shall be tendered in accordance with the principles of the relevant applicable EU procurement legislation with parallel publication of tender notices in the EU Official Journal.

    Statut

    Signé - 29/11/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Serbie Transports