Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080330
    Date de publication: 16 octobre 2008

    Promoteur – Intermédiaire Financier

    Ministry of Finance.

    Lieu

    Description

    This project is a proposed loan allocation under the China Climate Change Framework Loan (CCCFL). The project concerns various technical improvements in the coke plant (composed of 5 coke ovens coupled in two units) of an existing steel plant at Shaogang Songshan plant in Guangdong.

    The project is composed of 3 different subprojects, linked with the substitution of the wet quenching process by the CDQ process (Coke Dry Quenching), including: (i) and (ii) CDQ process equipment on a 6 m Coke oven and a 4.3 m Coke oven, and (iii) the construction and the operation of various gas tanks (by-products of the process).

    Objectifs

    The proposed operation would contribute to reducing the coke losses in the process of coke production, improving the coke quality, significantly reducing the environmental impact (atmospheric and liquid emissions, solid residues disposal) of this step of the steel process and improving overall energy efficiency.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 35 million.

    Coût total (montant approximatif)

    EUR 63 million.

    Aspects environnementaux

    The key objective of this allocation is to contribute to climate change mitigation. The schemes proposed under this project if located in the EU would be categorized as Annex I or II-type projects under the Environmental Impact Assessment (EIA) 97/11 amended 2003/35 Directive, which would require a mandatory environmental impact assessment or a review by the competent authority for the need to carry out an EIA. The investment schemes shall be prepared in line with the relevant national and EU environmental standards, including due consideration for protection of sites of nature conservation, as well as the social safeguards of the Bank. EIAs have already been prepared by specialized consultants. These issues will be addressed during the appraisal of the subprojects.

    Passation des marchés

    Procurement will be undertaken in accordance with the Bank’s Procurement Guidelines.

    Statut

    À l'examen - 16/10/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Chine Industrie