Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080250
    Date de publication: 29 juillet 2008

    Promoteur – Intermédiaire Financier

    Northern Gas Networks Limited.

    Lieu

    Description

    The operation is part of NGN’s investment program in its gas distribution network covering the period 2008-2010. The investment is in phase with the gas distribution price control period set out by the UK regulator, starting first of April 2008 for a period of 5 years.

    Objectifs

    The proposed programme aims at supporting sustainable safety, environmental and customer service standards set by EU and national legislation. The project will therefore contribute to improving the quality of life of the population in the Northern part of England.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to GBP 150 million.

    Coût total (montant approximatif)

    The total cost of the investment program for the period 2008-10 is estimated at GBP 390 million

    Aspects environnementaux

    Based on current information, the investment program falls under Annex II of the Environmental Impact Assessment directive (85/337/EEC as amended by 97/11/EC), leaving it to the competent authority to decide on the need for an EIA. During appraisal, the Bank will review the results of possible EIAs, mitigation and compensation measures and any effect on conservation sites (Natura 2000). In line with the Bank's guidelines, the promoter's capacity and procedures to ensure compliance with environmental and biodiversity regulations will be assessed during appraisal.

    Passation des marchés

    The promoter is required to tender works, supplies and services contracts following procurement rules of relevant national and EU legislation, as defined by procurement Directive 2004/17/EC, including the publication in Official Journal of EC where appropriate. Detailed procedures applied by the promoter will be reviewed during the appraisal.

    Statut

    Signé - 16/12/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Énergie