Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20070458
Date de publication: 13 mai 2008

Promoteur – Intermédiaire Financier

Electrabel S.A.

Lieu

Description

Construction of 2 combined cycle gas-fired units in Lelystadt, 1 combined cycle gas-fired unit in Amercoeur and 1 blast furnace residue gas-fired unit using gas from an Arcelor plant in Ghent.

Objectifs

The project aims to contribute to meeting the growing electricity demand and replace older, more polluting generation capacity.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 400 million

Coût total (montant approximatif)

n/a

Aspects environnementaux

The project components, due to their technical characteristics, fall under Annex I of the EIA-Directive 85/337/EC and amendments, require Environmental Impact Assessments (EIA). EIAs are finalised and permits have been granted by the competent authorities of Belgium and The Netherlands. The details of the EIAs and the results of public consultation and proposed mitigating measures will be reviewed during appraisal.

Passation des marchés

Compliance with the EU procurement directives and national laws shall be ensured.

Statut

Signé - 26/11/2008

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pays-Bas Belgique Énergie