Date de publication: 20 décembre 2007
Promoteur – Intermédiaire Financier
Österreichische Elektrizitätswirtschafts-AG
Lieu
Description
Construction and operation of a 98 km 380 kV high voltage overhead line from the Kainachtal substation near Graz in Styria to the Rotenturm substation in Burgenland.
Objectifs
The project constitutes a north-south HV power link critical for the regional grid stability. It has been identified as a TEN-e project of European interest in the priority interconnection plan and forms part of a priority axis identified under the revised 2006 TEN-e guidelines.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 85 million.
Coût total (montant approximatif)
EUR 170 million.
Aspects environnementaux
The project falls under the Annex I of EIA directive 85/337 as amended and requires an EIA, which was issued in 2005. The project was extensively debated in public as well as through the relevant administrative and judicial instances. It received approval in March 2007 by the competent authority, which was confirmed by the relevant courts. Environmental aspects under inclusion of mitigation measures will be assessed during appraisal. Compliance with EU environmental directives and national laws will be verified.
Passation des marchés
The promoter is subject to the requirements of the EU Procurement Directive 93/38/EC (as amended by 2004/17/EC) and committed to compliance.
Statut
Signé - 16/06/2008
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).