Référence: 20060462
Date de publication: 5 juillet 2007

Promoteur – Intermédiaire Financier

Metropolitan Municipality of Istanbul

Lieu

Description

The project consists of the construction of a new, 17 km long metro line on the Anatolian side of Istanbul and the extension of another one, 8 km in length, on the European side of the Metropolitan area.

Objectifs

The project will contribute to alleviate the present and future traffic problems.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Approximately EUR 500 million to 700 million.

Coût total (montant approximatif)

Up to EUR 1550 million.

Aspects environnementaux

The project forms part of a public transport development plan for Istanbul. Were to be implemented within the EU the project would fall within the scope of Annex II of Directive 85/337/EEC (as amended) and it is therefore for the competent authority to decide whether a formal Environmental Impact Assessment is required. According to Turkish legislation on the environment, a full EIA is not required for this type of project. However, a so-called pre-environmental impact study identifying the main impacts and defining the mitigating measures has to be carried out (to be checked during appraisal).

Passation des marchés

The Metropolitan Municipality of Istanbul (the awarding authority) follows standard international open tendering procedures in compliance with the Bank's guidelines for procurement.The promoter has informed the Bank that it is their intention to proceed in the similar way for the procurement of contracts related to the construction of the new line. Under these circumstances, the procurement procedures followed by the promoter are suitable for the project and acceptable for the Bank.

Statut

Signé - 11/04/2008

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Turquie Transports