Référence: 20060392
Date de publication: 8 janvier 2007

Promoteur – Intermédiaire Financier

Planta de Regasificación de Sagunto, SA.

Lieu

Description

First expansion phase of the Sagunto LNG Plant that will increase the LNG import capacity through the addition of one LNG storage tank and one open-rack seawater vaporiser.

Objectifs

The proposed expansion is included as a priority project in the March 2006 revision of the Spanish Energy plan 2002-2011. The Sagunto expansion was initially scheduled for 2012, but has been recently rescheduled for 2008 to enhance the security of supply of the Valencia region in the absence of sufficient back-up pipeline capacity.

Commentaires

Gas transportation.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to 65% of project cost.

Coût total (montant approximatif)

Approximately EUR 115 million.

Aspects environnementaux

The project falls under Annex II of Directive 97/11/EC, as amended by 2003/35/EC. The proposed expansion was already foreseen at the time of the initial construction of the Sagunto LNG terminal and was included in the original EIA carried out at that time that received approval from the Ministry of Environment in November 2002. The EIA process has been reviewed and found to be fully acceptable.

Passation des marchés

The promoter is a private company that receives, stores and re-gasifies LNG and supplies natural gas to the Spanish gas transmission system. It has no special or exclusive rights, which restrict the ability of other potential participants in the market for the provision of LNG services to enter and compete in that market, and is therefore not a contracting entity in the sense of Article 2 of the new Utilities Directive 2004/17/EC.

Statut

Signé - 21/03/2007

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Énergie