Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20060385
    Date de publication: 21 décembre 2006

    Promoteur – Intermédiaire Financier

    Public Enterprise "Roads of Serbia"

    Lieu

    Description

    The project concerns the construction of 47 km of bypass roads located in the West and South of the City of Belgrade. It includes the following works:

    • Section A: construction of a 2 x 2 lane motorway link between Batanica and Dobanovci (Roads E70 - E75; 10 km);
    • Section B: upgrading to 2 x 2 lane motorway standard of the existing road between Dobanovci and Ostruznica (16.8 km), including the construction of an additional bridge crossing the Sava river, and construction or finishing of the section between Ostruznica and Bubanj Potok (20.5 km), including 4 tunnels.

    Objectifs

    The project will allow a new alternative for transit traffic through Belgrade and will relieve traffic congestion within the city, especially on the Gazela Bridge and the urban sections of the E-70 and E75 highways.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 180 million.

    Coût total (montant approximatif)

    Up to EUR 530 million.

    Aspects environnementaux

    Should the project be in the EU, it would be subject to the requirements of the EU Directive 97/11 Annex I, i.e. full environmental impact assessment with public consultation. An EIA covering both sections included in the project has been prepared by an international consultant and was finalized in March 2005.

    The road corridor generally lies across agricultural land, away from residential areas. The topography and the geology of the soils of the section B are rather difficult.

    Environmentally sensitive areas have been identified along the route. However, no biodiversity areas protected under national or international legislation have been identified.

    Passation des marchés

    Procurement of works will be on the basis of open international competitive bidding in line with EIB's Guide to Procurement. It is expected that an appropriately staffed Project Implementation Unit (PIU) with experienced Technical Assistance will be responsible for assisting in the management of the procurement process.

    National competitive bidding will be applied for the procurement of the Design studies.

    The procurement of the Supervision and Management consultants will be on the basis of international competitive bidding according to EU-regulations.

    Statut

    Signé - 19/10/2007

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Serbie Transports