Référence: 20060324
Date de publication: 16 février 2009

Promoteur – Intermédiaire Financier

Roads of Serbia
Vlajkoviceva 19a
11000 Belgrade
Serbia

Lieu

Description

The project concernes the construction of a new motorway between Leskovac and FYROM border. It will be approximately 100 km long, with a cross-section of between 26 and 28 meters and designed for a speed of 100-120 km/h.

Objectifs

The new highway is expected to be suited to current and estimated future traffic levels, and is also expected to reduce the accident rate, which at present is relatively high.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 300 million.

Coût total (montant approximatif)

Around EUR 600 million.

Aspects environnementaux

According to preliminary information, Environmental Impact Assessment (EIA) studies have been carried out. The environmental process and identification and mitigation of possible negative effects on the environment, and to sensitive areas in particular, will be detailed in the appraisal. The environmental and social aspects will be further appraised.

Passation des marchés

The Promoter will ensure that any procurement procedures are done in accordance with EIB Guidelines and the relevant applicable EU rules.

Statut

Signé - 23/10/2009

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.