Date de publication: 5 décembre 2006
Promoteur – Intermédiaire Financier
Statens Serum Institut (“SSI”), Copenhagen.Lieu
Description
Construction of a multi-purpose production facility for vaccines and diagnostics at Statens Serum Institut.
Objectifs
The project will increase SSI’s existing capacity for the development and production of vaccines and the carrying out of associated R&D.
Commentaires
Pharmaceutical.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to DKK 252 million (EUR 33.8 million).
Coût total (montant approximatif)
Approximately DKK 505 million (EUR 67.7 million).
Aspects environnementaux
The project will not materially change current practice within the dedicated vaccine producing area. Other related activities will be carried out within existing facilities, making use of existing laboratories, pilot plants and clinical centres; an EIA is therefore not explicitly required under EU Directive 97/11. The promoter’s general compliance with environmental regulations whether the authorities have requested an EIA for the new facility will be verified during appraisal.
Passation des marchés
The promoter is a State-owned enterprise and, as such, the following EC Directives on procurement apply: Directive 92/50 on service supply, Directive 93/37 on public works and Directive 93/96 on goods supply. Procedures for procuring specialised equipment and external services will be verified during appraisal.
Statut
Signé - 21/12/2006
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).