Date de publication: 27 avril 2006
Promoteur – Intermédiaire Financier
Druzba za Avtoceste v Republiki Sloveniji d.d. (DARS)
Ulica XIV. divizije 4
SI-3000 Celje
Lieu
Description
The project concerns the construction of five new motorway sections. The sections concerned are
- Sentvid-Koseze (5.500km);
- Vrba-Peracica (9.780km);
- Ponikve-Hrastje (7.165km);
- Pluska-Ponikve (7.597km) and
- Slivnica-Drazenci (19.850km).
The total length of the road sections is approximately 50 km. All sections are located on the Trans-European Road Network (TEN-T) in Slovenia.
Objectifs
Completion of the Highway network in Slovenia
Commentaires
Motorways.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 300 million.
Coût total (montant approximatif)
EUR 600 million.
Aspects environnementaux
All schemes financed under the proposed project will be required to comply with the relevant national legal framework, to be acceptable in environmental terms to EIB and in line with EU environmental policy.
Passation des marchés
All the contracts to be financed by the Bank will be advertised in the EU Official Journal and open on equal terms to international competition in accordance with the Bank's procurement criteria.
Statut
Signé - 18/12/2006
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).